PT. Bank Central Asia Tbk, commonly known as Bank Central Asia (BCA) is an Indonesian bank founded on 21 February 1957. Their previous buildings often experienced leaks because they used cheap waterproofing, so it cost more to repair. In 2018, CEMENTAID was given the opportunity to assist them in the BCA Foresta Project.
The following are the structural areas using the HPI:
- REDSEAL 4, 1,440.2 m3, was applied to the top layer of raft foundation and slab basement 2nd and basement retaining walls 2nd.
- REDSEAL 2, 254.5 m3, was applied to the basement retaining walls 1st
- AQUAPEL 10 PB Reinforced, 1,577.2 m3, was applied to the roof of Basement, 2nd floor, 13th floor and 16th floor or roof top
- 3CC PB(B) Reinforced, 63 m3, was applied to the 9th floor
- AQUAPEL 10, 953 m3, was applied to the Slab and Wall of STP and GWT
The engineer team from the owner is satisfied with the HPI results and the service from the CEMENTAID team